Svitlovodsk River Terminal

Svitlovodsk River Terminal is an advanced elevator complex of AgroVista Holding (UkrAgroCom and Hermes-Trading Group) with a total capacity of 94,000 tons of grain storage; 5,000 tons per day of grain intake; 4,400 tons per day of grain handling and drying; 4,000 tons per day of railroad loading; and 5,000 tons per day of water transport loading.
Equipment from GSI (USA), Buller (Germany), Telestack (UK), ”
Mykolaivpromservice (Mykolaiv), Weighing Systems (Dnipropetrovs’k).
The general designer is OJSC PI Mykolaivagroproekt.
Designer of the berth – CJSC UPVKTRT Ukrrichtransproekt.
General contractor – CJSC Kremenchukneftekhimbud-invest.

Translated with www.DeepL.com/Translator (free version)

0

mln USD

Total investment amount

0

hectares

Total area of the enterprise

0

meters

The length of the berth.
Simultaneous mooring of two boats

0

tons

Simultaneous storage of grain

0

tons

Acceptance per day

0

tons

Processing and drying

0

tons

Loading on water transport per day

0

tons

Loading on railway transport per day

HISTORY OF THE CONSTRUCTION OF THE SVITLOVODSK RIVER TERMINAL

Contacts

Svitlovodsk River Terminal LLC

Address: 27500, Kirovograd region, Svitlovodsk, 1-A Lisozavodska str.

Tel: +38 (05236) 7-43-77, +38 (050) 488-22-11

Purchase of grain: +38 (0523) 6-74-37

Purchase and sale of plant protection products, seed, fertilizers: +38 (097) 005-99-44

+38 (097) 005-99-44

© 2021 AGROVISTA. All rights reserved.

Feedback